Welding and painting and roofing the awning
Welding the stair supports
Painting the deck
rails
Moving in the first furniture
The kitchen is
finished!!
Thanks, Seebeck Construction for the
welcome home basket
Our table is deliverd. How the heck will
we get this up the stairs?
It takes five strong
men
And here it is...Texas walnut harvested
just down river
Moving in
And baking cupcakes for Owen's
party
Monday, March 29, 2010
WE DID IT!!
March was full of painting, welding,
finishing and move in. We have a host of people to thank for helping create this
beautiful home on the river. Mainly, Alan, Peter, Sharon and Donna of Barley
Pfeiffer Architects; Curtis and Kim Seebeck of Seebeck Construction; and Ed
Martens of Ed Martens Interiors. Each of these fabulous folks helped us turn
vision into reality. Thank you.
Finishing the iron supports for the
overhang.
Walnut cabinet tops
Building the road
and the culverts
Sunday, January 3, 2010
December 2009
December
progress includes HVAC hookup and interior
surfaces.
Wood
floors
Front porch
rock column
More front porch rock column
It took several tries to get the fireplace rock right.
Master bath shower
A gorilla fork lift was hired to lift
the big granite.
Hooking up the stone
Flying high!!
Master bath stone countertop. That is a real fossil!
Here comes the big dog: 1800 pounds
Through the front door...
And onto the island. Hooray!
Looking great! Hoping to get the kitchen backsplash tile
soon.
The granite looks great in the house. It's the color of the river.
Tuesday, October 6, 2009
October 2009 - Doors and Window Trim
Doors are installed and trimmed; windows are
trimmed
Living room front door
Living room ceiling
Study
Master closet
Master bedroom door - two panel
Gravel bar below the little
swing

From gravel bar looking up river
Monday, September 7, 2009
Sunday, August 30, 2009